At least one gateway is required with every monitoring system using one of the following components:
#SE100-V, SE100-V2, SA100-HT, SA100-M.
Additional Gateways may also be necessary for complex sites, multi-locations and sites with cameras and/or pump controllers.
An internet connection is required with every gateway.
View cart “CDL Control Base – Computer” has been added to your cart.
Additional information
Weight | 20 lbs |
---|